PDA

View Full Version : Cummins powered website


<T M T T>
02-07-2007, 07:11 PM
http://newenglandturbodieselpower.com/?page_id=10

Cummins Power in our Website Facilities
A Small Orange hosts the space in which the New England Turbo Diesel Power website is built on. located in the Atlanta NAP in Atlanta, Georgia. This top tier facility features network connectivity over local fiber loop to one of the two main Telco Hotel vaults in Atlanta, Georgia with access to all major fiber and IP backbones. The network utilizes a RouteScience PathControl 5014 device for automatic route and speed optimization which ensures your data gets to you in the most fast and efficient manner. Network security is increased by automatic scanning of all traffic by a Tipping Point 1200E IDS system and Mcaffee IntruShield IDS system. This two-level scanning occurs over all network traffic to ensure only valid and safe requests are made towards you site.

Several crucial measures have been taken to make the network and building infrastructure reliable and secure. The building is protected with a pre-action fire suppression system and is monitored by the fire department. A state-of-the-art, fully redundant, parallel UPS system ensures continuous power via battery backup for up to 15 minutes at full capacity and several hours at current capacity. For longer term power outages, Cummins and ONAN diesel generator sets are located on site to provide fully redundant, parallel power with onsite 12,000 gallon tank and an emergency fuel delivery contract. These generators go from cold start to full power in 30 seconds to provide quick backup to the UPS battery system. Security is multi-layered to ensure maximum protection and efficiency. The facility is continuously monitored 24 hours a day, seven days a week by staff, guards, and security cameras.

Needless to say, with these sorts of facilities, you can rest assured that the N.E.T.D.P website is in good hands.

And to all that I want to say THANK YOU to A Small Orange for being the premier hosting facility for the NewEnglandTurboDieselPower website!

12PACK
02-07-2007, 09:44 PM
Sounds good. Just let me know when it's my turn to change the filters. :-)

Jim
02-07-2007, 10:57 PM
If the engines go into 3 cyl. idle because its cold out, is our website going to be half fast?:idea: